Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4578942 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Corrigendum : Re Tender- S0 552/26 Renovation Of Kanjirakund Vennettukadavu Road In Ward 11 At Tirur Municipality |
| Last Date For Submission | 22nd Jun, 2026 |
| Opening Date | 22 Jun, 2026 |
| Document Cost | 560.00 |
|---|---|
| EMD | 6353.00 |
| Estimated Cost | 254121.00 |
| City | Tirur |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taring & retaring | ||
| 2 | 2.15:Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202.<br> Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 0.864 | cum |
| 3 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 189.000 | sqm |
| 4 | 5.5.A.1a:Modified Penetration Macadam 50 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 20.400 | sqm |
| 5 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65) | 19.740 | sqm |
1 Days Left