Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4606267 |
|---|---|
| Organisation Name | Tiruttani Cooperative Sugar Mills Limited |
| Tender Brief | Corrigendum : Labour Contract For Kcp Boiler Id Duct From Boiler To Existing Suction Line Of Id Fan Damaged Portion Renewal Works |
| Last Date For Submission | 6th Jul, 2026 |
| Opening Date | 07 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Tiruvallur |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Labour contract for KCP Boiler Id Duct From Boiler To Existing Suction Line Of Id Fan Damaged Portion Renewal works 1. Newly Modified and Fabrication of ID Duct from KCP Boiler 1 & 2 Air pre heater outlet to existing ID fan suction line in steam of under ground flue gas path. 2. Dismantling and removing of damaged WIL Boiler ID duct from Boiler outlet to ID fan outlet upto chimney as identified by the Boiler Engineer Approximately 10.00 MT including 2 Boilers. 3. Damaged old Duct Plates are to be handed over to scrap yard through store after weighment as per the Engineers instructions. 4. Size of the duct as given drawing for modification by of duct from boiler Air preheater outlet to existing ID fan suction line. 5. Facbrication and Erection of ID duct damaged portion by new M.S plate 6mm Thickness as per our drawing for modified and existing outlet of ID fan duct from ID fan chimney. 6. All Welding portion should be proper welded and necessary stiffener angle given by the contractor. 7. After renewal of ID duct air leak checked with presents of boiler engineer and leak proved.( Rate per Ton ) | 1 | Rate per Ton |
| 2 | nlhr x g j thlif iy 1 k neu F | Select |
6 Days Left