| 2 | Design, Engineering, detailed survey, preparation of detailed drawings, design calculations, obtaining statutory approvals, supply, installation, testing and commissioning and successful completion of a turnkey EPC-Based Shore-to-Ship (STS) Power Supply System with a total installed Capacity of 10MW for the five berths in the Nort cluster comprising Oil jetty (4MW), Coal Jetty-I (1.5MW), Coal Jetty-II(1.5MW), North Cargo Berth-I(1.5MW), North Cargo Berth-II (1.5MW), including Static Frequency Converters (SFC), transformers, HT/LT Switch gears, Shore connection equipment, control cables, cable management systems, SCADA, PLC, Protection, metering, communication system, earthing, lightning protection, fire protection system, civil and structural works, control room, cable trenches, utility services, Port and Fact acceptance tests, performance guarantee tests, integration with the Port electrical network, preparation of as-built drawings, O&M manuals, training of Port personnel, comprehensive warranty for two(2) years, and all equipments, materials, accessories, consumables, software, hardware, spares, tools, statutory clearances, and incidental works required for the complete and successful execution, commissioning, operation and handing over the project in accordance with IEC/ISO/IEEE 80005 Standards and applicable statutory regulations. | 1 | lot |