Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: V O Chidambaranar Port Trust
Tender ID4806084
Organisation NameV O Chidambaranar Port Trust
Tender BriefProviding The Multipurpose Shed Including Toilet Facilities At Maintenance Sub Division In Voc Port
Last Date For Submission21st Jul, 2026
Opening Date22 Jul, 2026
Cost
Document Cost0.00
EMD80957.00
Estimated Cost0.00
Location
CityTuticorin
StateTamil Nadu

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork excavation in trenches for foundation in sand and other loose soils not exceeding 1.50m in width and including dressing of sides and ramming of bottom lift upto 1.50m including getting out of the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m and lift of 1.50m, cost including shuttering, strutting, bailing out seepage of water wherever necessary etc., complete complying with AISS and as directed by the departmental officers.40.000CUM
2Providing and laying Plain Cement Concrete 1:3:6 (One part of cement, 3 parts of M. Sand (Crushed Stone Sand) & 6 Parts of 40 mm nominal size metal ) for foundation using 40 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., complete complying with AISS and as directed by the departmental officers.30.000CUM
3Providing and laying Reinforced Cement Concrete 1:1.5:3 (One part of cement, One and a half parts of M. Sand (Crushed Stone Sand) & Three Parts of graded stone aggregate (i.e.) 2 parts of 20mm nominal size graded metal & 1 part of 10mm nominal size graded metal) using 20 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., and excluding the cost of form work and reinforcement grills for all RCC works in all floors upto full height of the building etc., complete complying with AISS and as directed by the departmental officers.30.000CUM
4Providing Form work including centring, shuttering for foundation footings of columns, mass concrete so as to give a rough finish shuttering and propping etc., complete complying with AISS and as directed by the departmental officers.220.000SQM
5Fabricating and placing in position of M.S / Tor steel grills for R.C.C works in all floors including cost of Steel, cutting, bending, binding with 16 Gauge GI Binding wire and placing in position etc., complete complying with AISS and as directed by the departmental officers.5.000MT
21st Jul, 2026