| Tender ID | 3888927 |
|---|---|
| Organisation Name | Medical Health And Family Welfare Department |
| Tender Brief | 1. Construction Of Shc Building At Bhev Distt. Sirohi. |
| Last Date For Submission | 15th Apr, 2026 |
| Opening Date | 16 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 97280.00 |
| Estimated Cost | 4864000.00 |
| City | Udaipur |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PARTICULARS | ||
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 520.00 | sqm |
| 3 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 322.52 | cum |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | 94.83 | cum |
| 5 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods watering, rolling each layer with 1/2 tonne roller, or stone or steel rammers and rolling every 3rd and top- most layer with power roller of minimum 8-10 tonne capacity and dressing up in embankment for roads, flood banks marginal banks and guide banks or filling up ground depressions, lead up to 50 Mtr. and lift up to 1.5 Mtr.:All kinds of soil - (Deduct)Banking excavated earth in layers not exceeding 20cm. in depth breaking clods watering, rolling each layer with 1/2 tonne roller, or stone or steel rammers, and rolling every 3rd and top- most layer with power roller of 8-10 tonne capacity and dressing up in embankments for roads, flood banks marginal banks, and guide banks etc. lead up to 50 Mtr. and lift up to 1.5 Mtr.All kinds of soils | 324.00 | cum |