Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4856348 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Patch Repair Work With High Performance Ready Mix Cement Concrete And Ready Made Cold Bitumin Repair In Nagar Nigam Zone 1 Area (e_16 / Nirman_01) |
| Last Date For Submission | 15th Jul, 2026 |
| Opening Date | 16 Jul, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 42440.00 |
| Estimated Cost | 2122000.00 |
| City | Udaipur |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply of readymade cold bituminious mixture for pothole patching in patching in accordance with IRC:116-2014 specifications with IRC:116-2014specifications with5.6% MC-800 Cut back bitumen and suitable anti stripping agent withall lead and lift in 50 kg plastic lined sturdy bags complete in all respectas per direction of engineer-in-charge inculding all trasnportation, stacking & taxes etc. | 40000.00 | kg |
| 2 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance IRC: 116-2014 specifications with all lead and lift for placementatsitecompleteinall respectas per direction of Engineer-in-charge inculding all texes etc. | 40000.00 | kg |
| 3 | Providing and laying treatment of wear & tear concretesurfacewithpre-mixed, ready touse, high performance, curing free, quicksetting ready touse cementmortar for repairing of potholes with minimum 25mm depth and without cutting the panel so that traffic can be mobilized in 4 hours. The high performancecement shouldbecuring free, achieve compressive strength of 10 MPa within 4 hours achieve bond strength of 4MPa within 24hours non shrink and non toxic. | 15.00 | cum |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (PugMill),carriage ofmixedmaterial by tipper tosite, laying in uniform layers in subbase/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to100kNweight to achieve the desired density including lighting,barricading and maintenance of diversion, etc as per Tables400-12&400-13 and MoRTH Specification Clause 406. | 150.00 | cum |
8 Days Left