| Tender ID | 4218731 |
|---|---|
| Organisation Name | Directorate Of Municipal Administration |
| Tender Brief | Corrigendum : Proposed Construction Of Sabhagruha (first Floor) At Madha Colony In Prabahg.no.3 Under Dalit Vasti Sudhar Yujana For Municipal Council Udgir |
| Last Date For Submission | 16th May, 2026 |
| Opening Date | 18 May, 2026 |
| Document Cost | 20000.00 |
|---|---|
| EMD | 31980.00 |
| Estimated Cost | 3197977.00 |
| City | Udgir |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | SUB WORK NO:- 1. PROPOSED CONSTRUCTION OF SABHAGRUHA (FIRST FLOOR) AT MADHA COLONY IN PRABAHG.NO.3 UNDER DALIT VASTI SUDHAR YUJANA FOR MUNICIPAL COUNCIL UDGIR | ||
| 2 | Dismantling the R.C.C. work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. | 0.316 | cum |
| 3 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed. | 0.25 | cum |
| 4 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) | 2.70 | cum |
| 5 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m). | 1.80 | cum |
Ending Today