Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3934634 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Addn/altn To Building No P-06 (para-35) At Hq Northern Command Under Ge (utilities) Udhampur |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 25 Apr, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 238000.00 |
| Estimated Cost | 16263000.00 |
| City | Udhampur |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking down cement plaster, any description on brick or stone or cement concrete walls including raking out joints, hacking for key, removing all type of vegetation (like peeple tree etc) scrubbing down with water complete, all as specified and as directed. | 294.54 | Square meter |
| 2 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for complete all as specified and directed. | 17.50 | Cubic Meter |
| 3 | Demolition of brick work or stone masonry built in cement mortar including all quoins arches, pillars etc but excluding ashlar facing, dressed stone work and precast concrete articles, complete all as specified and directed. | 0.85 | Cubic Meter |
| 4 | Preparing of concrete surfaces on slabs, chajjs by Chipping away loose, spalled, or carbonated concrete until sound concrete is reached, expose corroded reinforcement fully; remove rust using a wire brush or mechanical means.Clean the substrate with a high-pressure water jet to remove dust and oil. Apply a rust remover followed by an anti-corrosive primer (Dr. Fixit Epoxy Zinc Primer). Install watertight, rigid shuttering to prevent leakage and ensure the desired profile. Laying micro concrete up to the required thickness on the designated area with proper shear connector and bonding agent while the surface is "SSD" (Saturated Surface Dry). Make : Dr. Fixit 208 Micro Concrete/Ultratech microkrete. The concrete thickness varies from 15mm to 35mm | 48.00 | Square meter |
| 5 | Excavating over area, not exceeding 1.5 m depth; for foundation, etc. and getting out in any type of soil, complete all as specified and as directed. | 52.50 | Cum |
16 Days Left