Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Rural Development And Panchayati Raj Department
Tender ID5025576
Organisation NameRural Development And Panchayati Raj Department
Tender BriefConstruction Of T/road From Main Road To Kania Janni Wno 1 And Construction Of T/road From Ms Touri To House Of Madan Lal Wno 1 Panchyat - Sunetar-b Block . Ramnagar Under. (pri) Capex Budget For The Year 2026-27
Last Date For Submission4th Aug, 2026
Opening Date05 Aug, 2026
Cost
Document Cost600.00
EMD5620.00
Estimated Cost281000.00
Location
CityUdhampur
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil 80% Ordinary Rock 20% 306.00cum
2Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : 210.00cum
3Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil 80% & Ordinary Rock 20% 8.55cum
4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) 1.71cum
5P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. (70% c.concrete)2.39cum
4th Aug, 2026

14 Days Left