Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5025767 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of Toilet For Female Staff Along With All The Allied Works In The Premises Of Mech And Hospital Division, Udhampur |
| Last Date For Submission | 30th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 10982.00 |
| Estimated Cost | 549113.00 |
| City | Udhampur |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Septic Tank Excavation Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.2 ordinary rock. Qty: -9 x9 x6 = 486 cft = 13.74 cum. | 13.740 | cum |
| 2 | Base: - Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size) Qty: - 9 x9 x0.5 = 40.5 cft = 1.14 cum. | 1.140 | cum |
| 3 | Base layer:- Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size). Qty: - 9 x9 x0.5 = 40.5 cft=1.14 cum. | 1.140 | cum |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1 :3 (1 cement: 1 coarse sand: 3 graded stone aggregate 20 mm nominal size) 1. Piller Foundation Qty = 4(3 x3 x1 ) = 36 cft 2. Column and pedestal Qty= 4(1 x1 x13 ) = 52 cft 3. Walls = Qty= (9 x6 x1 )4= 216 cft 4. Slab 1 =Qty= 9 x9 x0.5 = 40.5 cft 5. Slab 2 = Qty = 11 x11 x0.5 = 60.5 cft Total Qty: - 405 cft = 11.46 cum. | 11.460 | cum |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more 10 mm rebar ,16mm rebar, 8mm strips,12mm rebar. Total Qty: - 710.29 kg. | 710.290 | kg |
9 Days Left