Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4995202 |
|---|---|
| Organisation Name | Rural Development And Panchayati Raj Department |
| Tender Brief | Corrigendum : Const Of Lane Drain From House Of Tara Chand Toward House Of Bandhu Ram And Jeet Kumar Ward No 01 And Lane Drain From House Of Pritam Lal Toward Nalla And Ramp Nho Yog Raj Ward No 2 Pyt Malhar Lower, Block Udhampur, Under Capex |
| Last Date For Submission | 10th Aug, 2026 |
| Opening Date | 11 Aug, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 5560.00 |
| Estimated Cost | 278000.00 |
| City | Udhampur |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :30% | 0.36 | cum |
| 2 | Earth work in manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: hard rock blasting prohibited 70% | 0.83 | cum |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 86.43 | sqm |
| 4 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil 40% | 1.35 | cum |
| 5 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Hard rock blasting prohibited | 6.69 | cum |
8 Days Left