Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4968428 |
|---|---|
| Organisation Name | Rural Development And Panchayati Raj Department |
| Tender Brief | Corrigendum : Construction Of Lane/drain With P/work From Sh. Chanchal Singh House To Sh. Joginder Singh House At W. No. 08, Pyt Babey, Block Khoon District Udhampur Under Pri Capex For The Year 2026-27 |
| Last Date For Submission | 5th Aug, 2026 |
| Opening Date | 06 Aug, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 2522.00 |
| Estimated Cost | 126100.00 |
| City | Udhampur |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead upto 50meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 45.36 | sqm |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: A.K.S (in-stretches) | 7.00 | cum |
| 3 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size excluding the cost of centring and shuttering all work upto plinth Level | 4.72 | cum |
| 4 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) | 8.86 | cum |
| 5 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) Labour Rate | 0.98 | cum |
6 Days Left