Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4299857 |
|---|---|
| Organisation Name | Power Development Department |
| Tender Brief | Corrigendum : Permanent Restoration Of Damaged Infrastructure Due To Flash Flood Under The Jurisdiction Of Tlmd Iii Udhampur Jkptcl Jammu In District Udhampur |
| Last Date For Submission | 11th Jun, 2026 |
| Opening Date | 12 Jun, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 200000.00 |
| Estimated Cost | 9983000.00 |
| City | Udhampur |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | 220/132/33 KV Grid Sub station Udhampur | ||
| 2 | CONTROL ROOM | ||
| 3 | Clearing of roof for waterproofing treatment | 1.00 | job |
| 4 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound@ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg./sqm. and coarse sand @1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately) For the purpose of measurement the entire treated surface will be measured. | 1015.00 | sqm |
| 5 | Providing and laying common burnt clay (non modular) brick tiles of class designation 10 over mumty roofs grouted with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement, over a 12 mm layer of cement mortar 1:3 (1 cement : 3 fine sand) and finished neat. | 1015.00 | sqm |
6 Days Left