Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5024932 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Providing And Topping Up Of T-oil To Voltage Stabilizer And Electric Transformer Alongwith Allied Works At Various Pumping Station Of Khoon And Majalta |
| Last Date For Submission | 3rd Aug, 2026 |
| Opening Date | 04 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 3000.00 |
| Estimated Cost | 150000.00 |
| City | Udhampur |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and topping up of t-oil to voltage stabilizer and electric transformer along with allied works at various pumping station of khoon and majalta by way of loading of the transformer oil barrels at the workshop manually or by using crane in the vehicle and shifting the same to the sites. The job further involves unloading of the barrels at roadside of the pumping stations then shifting the same manually to the site of pumping stations by head load. Thereafter filling / topping up of t-oil 280 litres. approximately in khoon and nakki khoon pumping stations 400 kva ,250 kva and 250 kva electric transformers and 250 kva voltage stablizers then topping up of t-oil at bilaspur deot stage 0 and stage 1st p/stn 250 kva electric transformers approx 170 litres,then topping up of t-oil at Channi mansar stage 0 and stage 2nd 250 kva electric transformers approx 120 litres ,then filling up of t-oil at majalta p/stn 250 kva and 100 kva electric transformers and 100 kva voltage stablizers approx 140 litres then filling up of t-oil at mansar p/stn 250 kva electric transformer 90 litres approx then heating the same for about six hours and then testing on full load.Job also includes Replacement of damaged link set of 250 KVA electrical sub-station installed at pumping station bilaspur deot stage 1st and Channi mansar stage 1st by way of disconnecting the same from the pole providing and fitting of new link set of same rating including replacement of required aluminum conductor, nuts and bolts and hooks etc.Job includes the cost of material, labour charges, hire charges of tools and tackles etc. Rebate, if any, should be quoted by the firm separately. (Complete job). | 1 | job |
13 Days Left