| Tender ID | 4605793 |
|---|---|
| Organisation Name | The Fertilisers And Chemicals Travancore Limited |
| Tender Brief | Corrigendum : Miscellaneous Instrumentation Work Contract For Dn, Cpp, Ammonia Handling And Offsite Plants Of Petro Uc |
| Last Date For Submission | 9th Jul, 2026 |
| Opening Date | 10 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 5000.00 |
| Estimated Cost | 0.00 |
| City | UDYOGAMANDAL |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Fabrication and mounting of Instrument stanchions. Work includes fabrication of instrument stanchion (size 50 NB, SCH80 MS pipe,length 130cm) with base plate of size 225mm X225mm X 6mm.and fixing the stanchion on the floor at site using anchor bolts. Note: All the materials will be issued by FACT except welding and cutting machine. | 10 | NO |
| 2 | Fabrication and mounting of field Instrument supports. Work includes fabrication of instrument supports ( size 50 NB, SCH80 MS pipe,"L"shape size 300X 200mm) and fixing the support on the "I" beam at plant site. Note: All the materials will be issued by FACT except welding and cutting machine. | 10 | NO |
| 3 | Dismantling of Flush mounting type Level transmitters / Magnetic Flow Heads / Mass flow meters (End connection flange size from 80NB/100NB rating up to 300#, having weight range 30 to 50kg, total end conection flange bolts 16 nos) from plant site, transporting them to Instrumentation lab, bringing back to site and fixing back in position leak proof at site with proper gaskets, bolts & nuts. All the materials required for the work will be supplied by FACT as free issue. | 10 | NO |
| 4 | Removal and refixing of rotameters. Work includes the removal of rotameters (two flanges and four bolts/flange) of size up to 100NB from line, dismantling, cleaning, assembling, refixing and glanding and cable termination. | 12 | NO |
| 5 | Dismantling of level trol head assembly and displacer. Work includes dismantling of cable,removal of LT head assembly and its displacer from tank/vessel, transportation to workshop, cleaning, fixing of LT head and displacer, cable glanding and termination. All materilas required for the work wil be issued by FACT. | 10 | NO |