Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Energy And Petrochemicals Department
Tender ID5182798
Organisation NameEnergy And Petrochemicals Department
Tender BriefCorrigendum : As And When Required Grass/jungle Cutting Work Of Unit-6 Area At Gsecl Tps Ukai.(wt-5219 Civil Ph)
Last Date For Submission29th Aug, 2026
Opening DateRefer to Documents
Cost
Document Cost1770.00
EMD71572.00
Estimated Cost0.00
Location
CityUkai
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
1Cutting & removing grass, shrubs, bushes etc including removing by other means from area as per priority given by the E.I.C. & also removing unwanted plants like Bordies, Ankdas, Nafatias, kavach etc., from ground and from fencing, electrical poles, compound walls with help of spade, pickaxe, sickle etc., and dispose off the cut grass, shrubs and unwanted plants etc complete up to 6Km or any lead as directed by E.I.C. whose decision shall be final and binding to the contractor. Any useful and unuseful cut grass and unwanted plants, shrubs, will be complete properly stacked and to be disposal or taken out by the contractor as per instruction of E.I.C. The rate includes all tools and tackles, equipment, transportation, loading & unloading labour etc complete. Nothing will be issued by the GSECL. The contractor has to dispose off the cut grass outside from plant area. The measurement for the payment will be made in Smt. of actual work done area. Note: - All precautionary measures are to be taken by the contractor during execution of work.700000.00Smt
2Labour charges of trimming of trees at any height and of size more than 300 mm dia. in plant premises, cutting the all required branches as directed including insurance, safety and all risks. Cutting it in small branches not more than 1.20 mtr. including stacking and crediting the branches of removed trees properly with all tools and tackles and transporting by tractors where directed by EIC by the contractor etc. complete as directed by EIC.50.00No.
3Providing & spraying Antiweed spray GYPHOSPHATE (Glyoel 41 percentage SL/Round-up 41 percentage or Equivellent) one round at every two months or as per site condition & instruction of EIC. Up-keeping by drying,cutting, removing jungle grass & plants / trees like bordi, babul, akada, etc. in plant premises. The item is also include removing and maintaining the chainlink fancing /wall with concertina fancing gate etc,and disposed off the drying grass, shrubs and unwanted plants etc. to outside the Power House up to any lead as directed by E.I.C. whose decision shall be final and binding to the contractor. The item rate includes all tools and tackles, PPE, insurance, transportation, loading & unloading etc., labours, etc.completed120000.00SMT
4Cutting & removing grass, shrubs, bushes etc including removing by other means from area as per priority given by the E.I.C. & also removing unwanted plants like Bordies, Ankdas, Nafatias, kavach etc., from ground and from fencing, electrical poles, compound walls with help of spade, pickaxe, sickle etc., and dispose off the cut grass, shrubs and unwanted plants etc complete up to 6Km or any lead as directed by E.I.C. whose decision shall be final and binding to the contractor. Any useful and unuseful cut grass and unwanted plants, shrubs, will be complete properly stacked and to be disposal or taken out by the contractor as per instruction of E.I.C. The rate includes all tools and tackles, equipment, transportation, loading & unloading labour etc complete. Nothing will be issued by the GSECL. The contractor has to dispose off the cut grass outside from plant area. The measurement for the payment will be made in Smt. of actual work done area. Note: - All precautionary measures are to be taken by the contractor during execution of work.700000.00Smt
5Labour charges of trimming of trees at any height and of size more than 300 mm dia. in plant premises, cutting the all required branches as directed including insurance, safety and all risks. Cutting it in small branches not more than 1.20 mtr. including stacking and crediting the branches of removed trees properly with all tools and tackles and transporting by tractors where directed by EIC by the contractor etc. complete as directed by EIC.50.00No.
29th Aug, 2026

14 Days Left