| Tender ID | 3824255 |
|---|---|
| Organisation Name | National Highways And Infrastructure Development Corporation Limited |
| Tender Brief | Corrigendum : Emergent Maintenance Of The Existing Road Of The Project Construction Of Two Laning With Hard Shoulder Road Of Ukhrul Tolloi Tadubi Section Of Nh102a From Design Chainage Km 81.870 To 105.825 Utt Package 4 At The Risk And Cost Of The Epc Contractor |
| Last Date For Submission | 15th Apr, 2026 |
| Opening Date | 16 Apr, 2026 |
| Document Cost | 11800.00 |
|---|---|
| EMD | 1436894.00 |
| Estimated Cost | 143689399.00 |
| City | Ukhrul |
|---|---|
| State | Manipur |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m) | 37396.10 | Cum |
| 2 | Compacting original ground supporting subgrade Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction. | 2760.00 | Cum |
| 3 | Cement Treated Crushed Rock or Combination as per clause 403.2 and providing, laying and spreading Material on a prepared sub grade, adding the designed quantity of cement to the spread Material, mixing in place with rotavator, grading with the motor grader and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base. (i) for Sub-Base course | 798.70 | Cum |
| 4 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 947.40 | Cum |
| 5 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rale of 0.70 kg/sqm using mechanical means. | 15417.30 | Sqm |