Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4188500 |
|---|---|
| Organisation Name | Western Coalfields Limited |
| Tender Brief | Corrigendum : Drilling And Construction Of 01 No. Borewell Along With Pump House And Ground Water Tank At Mkd-iii Oc Mine Of Umrer Area. |
| Last Date For Submission | 19th May, 2026 |
| Opening Date | 20 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 23700.00 |
| Estimated Cost | 1889721.00 |
| City | Umrer |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Item Description/ Heading | ||
| 2 | Consultancy for Geo physical resistivity ground water survey as per direction of EIC. (Payment for the entire contract will be withheld if the geophysical survey fails to locate the groundwater) (For 2 No. Probe) | 1.000 | each |
| 3 | Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level. All types of soil 300 mm dia | 25.000 | Mtr |
| 4 | Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level. Rocky strata including Boulders 300 mm dia | 65.000 | mtr |
| 5 | Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer -in-charge, beyond 90 metre & upto 150 metre depth below ground level.Rocky strata including Boulders.300 mm dia | 10.000 | Mtr |
3 Days Left