Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4124021 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Vikas Khand Sumerpur Gram Raghunath Khera Me Main Road Se Abadi Bhag Me Interlocking Karye |
| Last Date For Submission | 4th May, 2026 |
| Opening Date | 04 May, 2026 |
| Document Cost | 2384.00 |
|---|---|
| EMD | 66000.00 |
| Estimated Cost | 3292000.00 |
| City | Unnao |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in Foundation in O/S (loam clay or sand) including lift upto 1.50m & lead upto 30m & including filling watering and ramming of excavated earth into the trenches or into the space Between the building and the sides of foundation. (P.W.D. Sch No. 251) | 159.30 | cum |
| 2 | Earthwork cutting & embankment in O/S excavation to be in form of regular pits not exceeding 1.0 m and 50 cm in depth and earth work in embankment to in 20cm Layers including ramming and dressing the surface to required level and slops and also including 1.50 m lift and 30.0 m lead . the form cutting to be useed in making embankment or to be deposit as spoil banks with in 30m distence as directed by the engineer in charge as per si no. 253. Including Cartage From 5.0km . | 272.58 | cum |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 177.00 | Cum |
| 4 | Providing and Laying Cement Concrete 1:4:8( (1 cement : 4 fine sand :8 graded brick aggregate 40 mm nominal size) including supply of all materials, labour and T & P etc required for proper completion of the work and curing complete also including cost of form work in foundation and floors. SI No 281 | 48.68 | Cum |
| 5 | M150 B/W in 1:4 Cement:C Sand Mortar in Plinth & Foundation Including Supply Of All Materials Labour And T&P etc. As per si no 305(b). | 99.06 | Cum |
5 Days Left