Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3832390 |
|---|---|
| Organisation Name | Industries And Mines Department |
| Tender Brief | Work Of Construction Of Vehicular & Utility Bridge Over Mini River Including Approach Roads Between Nandesari Industrial Estate And Pcc Ranoli Industrial Estate. (re-invited) |
| Last Date For Submission | 15th Apr, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 21240.00 |
|---|---|
| EMD | 1468977.00 |
| Estimated Cost | 146897653.07 |
| City | Vadodara |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | BOQ1- Vehicular & Utility Bridge :- Clearing and grubbing road land including uprooting rank vegetation grass bushes,shrubs,sapling and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials (C) By mechanical means in area of light jungle. | 0.500 | Hectare |
| 2 | Demarkation of road alingment including marking out road line by providing and fixing wooden pegs or steel rod of required size at every 25 M to 50 M. including excavating trenches ion both sodes of 0.30 m. x 0.30M. including supplying of labours and all materials for every work etc. complete. | 0.500 | Km |
| 3 | Fabrication and installation of barricades including painting with fluorescent paint and fixing panelled plain MS sheets 20 SWG of 1.8 m height and M.S. Posts angle 40 x 40 x 5 mm at 2.5 m c/c and dismantling the same after completion of work, arrangement for blinker lights on barricades during night as per requirement and as per the instruction of the engineer as per site requirements. During the construction, barricading has to be kept continuously. Nothing extra will be paid for dismantling and re-erecting the barricades for other location and for the purpose of road widening/diversion/resurfacing, utility identification/diversion etc. There should not be any opening at the end of barricade except at locations approved by Engineer.Note: (i) Barricades on either side shall be measured individually. (ii) Once barricade has been provided and work started, removal of barricade will not be permitted till completion of pile, pile cap, pier and pier caps, portal beams, segment erection, I girder, erection, till completion of entire superstructure.(iii) For barricades adequate blinking lights on barricade during night time must be ensured. The cost of this item should include provision for power pack / Genset etc. so as to ensure the blinking of lights in night time as long as barricades are in position at the work spot. (iv) After completion of the entire work, the barricades shall be the property of the contractor.(v) The rates should be all inclusive for shifting/erecting/re-erecting the barricade for utility diversion/identification & road widening/diversions. (vi) It is specifically highlighted that barricading provided during construction shall be limited to 1m to 2m from outer edge of structure to be constructed. | 180.000 | Each |
| 4 | Dismentaling the existing structure including removing and stacking the dismentelled materials as and where directedA. RCC Work. | 1210.000 | Cum |
| 5 | Rubble Masonry | 130.000 | Cum |
20 Days Left