Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4068649 |
|---|---|
| Organisation Name | Uttar Pradesh Housing And Development Board |
| Tender Brief | Corrigendum : Construction Of Administrative Building At Jalalpur Police Station, District Jaunpur |
| Last Date For Submission | 26th May, 2026 |
| Opening Date | 26 May, 2026 |
| Document Cost | 8850.00 |
|---|---|
| EMD | 1464000.00 |
| Estimated Cost | 0.00 |
| City | Varanasi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m In all kind of soil upto 1.5m depth DSR 2.8.1 | 2875.54 | CUM |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m In all kind of soil upto 1.5m to 3.0m. depth DSR 2.26.1+2.8.1 | 1068.47 | Cum |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m In all kind of soil upto 1.5m to 3.0m. depth DSR 2.26.1*2+2.8.2 | 31.00 | Cum |
| 4 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift DSR 2.25(A) | 33.35 | CUM |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. DSR 2.27 | 750.91 | CUM |
5 Days Left