Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4090758 |
|---|---|
| Organisation Name | Purvanchal Vidyut Vitaran Nigam Limited |
| Tender Brief | Corrigendum : The Work Of Locating And Repairing Damaged Underground Cables, 33 Kv And 11 Kv Lines Through Departmental Fault Locator Machines. |
| Last Date For Submission | 16th May, 2026 |
| Opening Date | 16 May, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 8500.00 |
| Estimated Cost | 0.00 |
| City | Varanasi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | VARIABLE EXECUTION CHARGES (LABOR) 33 KV Cable Fault (Labor) | ||
| 2 | Assistance Basis: Rectification of 33KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, back filling & leveling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. | 100 | Job |
| 3 | Assistance Basis: Replacement of 33KV Indoor/Outdoor Cable box using Indoor/ Outdoor End Termination Kit, where jointing/installation is in the scope of the Supplier Firm. The Work includes providing physical assistance to the Supplier s jointer, including manual support during cable preparation (straightening/ holding). The firm is also responsible for arranging safe access (ladders/scaffolding) and ensuring final site cleaning and waste disposal | 80 | Job |
| 4 | VARIABLE EXECUTION CHARGES (LABOR) 11 KV Cable Fault (Labor) | ||
| 5 | Assistance Basis: Rectification of 11KV UG fault using store-issued Straight-Through Joint (STJ), where jointing/installation is in the scope of the Supplier Firm. The Work includes digging/opening trench, barricading, manual assistance in cable preparation, High Voltage testing of cable, backfilling & leveling of road as it was earlier, laying of additional cable if required for cable jointing (in case of loop not available) and site cleaning. | 100 | Job |
7 Days Left