Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4243589 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Gram Bela Me Shri Gharbaru Maurya Ke Ghar Se Baba Sahab Mandir Tak Tiwaripur Me Pakke Marg Ka Nirman Karya |
| Last Date For Submission | 11th Jun, 2026 |
| Opening Date | 11 Jun, 2026 |
| Document Cost | 2354.00 |
|---|---|
| EMD | 66980.00 |
| Estimated Cost | 3349000.00 |
| City | Varanasi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in cutting/Filling in Embankment in ordinary soil excavation to be the form of regular pits not exceeding 1/2 meter (20") in depth and earth work in enbankment to be in 20cm (8") layers, including ramming and dressing the surface to required levels and slopes and also including 1.5m (5") lift and 30m (100') lead. the earth form by cartege up to 6 km distance as directed by the E/I. S.I. No 253 Analysis | 349.250 | cum |
| 2 | Excavation in founadtion in ordinary soil (loamclay or sand) including lift up to 1.5 m and lead up to 30m. And including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30m, from the foundation trenches including all T & P phowarah and basket etc. complete. S.I. No-251 | 67.760 | cum |
| 3 | Concrete with 4cm. Gauge brick ballast, sand of 1.25 F.M. and cement in proportion of 1:6:12 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work S.I. No-273 | 33.180 | cum |
| 4 | M-150 brick work in 1:4 Cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work. S.I. No-305 | 159.460 | cum |
| 5 | Providing and laying 350 mm Dia NP3 RCC hume pipe medium duty confirm to IS 458 : 2003 including collars / spigot jointed with stiff mixture of cement in the proportion of 1:2 including testing of joints all taxes transportation charges & contractor "s profit etc. complete. | 25.000 | rm |
30 Days Left