Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3930928 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Gram Saraiya Ayar Me Pakki Sadak Se Anusuchit Jati Basti, Brahman Basti Tatha Kshatriya Basti Hote Hue Dusari Oor Pakki Sadak Par Interlocking Ka Karya. |
| Last Date For Submission | 21st Apr, 2026 |
| Opening Date | 21 Apr, 2026 |
| Document Cost | 766.00 |
|---|---|
| EMD | 21840.00 |
| Estimated Cost | 1092000.00 |
| City | Varanasi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in cutting or in embankment in ordinary soil excavation pits not exceeding 1/2 meter (20") in depth and earth work in enbankment to be in 20cm (8") layers, including ramming and dressing the surface to required levels and slopes and also including 1.5m (5") lift and 30m (100') lead. the earth form cutting to be used in making embankent or to be deposited as spoil banks within 30m (100') distance as directed by the E/I. S.I.No-253 I/C Mechanical Compaction in layer by Road Roller DSR 1.1.2 | 208.500 | cum |
| 2 | Excavation in founadtion in ordinary soil (loamclay or sand) including lift up to 1.5 m and lead up to 30m. And including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30m, from the foundation trenches including all T & P phowarah and basket etc. complete. S.I. No-251 | 31.200 | cum |
| 3 | Concrete with 4cm. Gauge brick ballast, sand of 1.25 F.M. and cement in proportion of 1:6:12 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work S.I. No-273 | 9.000 | cum |
| 4 | M-150 brick work in 1:4 Cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work. S.I. No-305 | 144.855 | cum |
| 5 | 12 mm thick cement plasterin 1:4 cement morter I/C all material labour T&P proper complition to the work . S.I. No-584 | 187.500 | sqm |
14 Days Left