Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4246731 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Janpad Varanasi Me Kallipur Benipur Dindaashpur Marg Ke Km 1 Me 3x3x3 Miter Box Calvart Ka Nirman Ka Karya |
| Last Date For Submission | 18th May, 2026 |
| Opening Date | 18 May, 2026 |
| Document Cost | 854.00 |
|---|---|
| EMD | 256000.00 |
| Estimated Cost | 0.00 |
| City | Varanasi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.(Cement Concret/ Brick)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 88.90 | Cum |
| 2 | Earthwork in excavation for foundation of structure as per drawings and technical specification, including setting out, construction of shoring and bracing, removal of sumps and other deleterious matter, dress of sides and bottom backfilling with approved material.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 164.42 | Cum |
| 3 | Sand Filling in foundation trenches as per drawing and technical specification(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 64.75 | Cum |
| 4 | PCC Grade M-15 in open Foundation complete as per drawing and Technical specifications.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 10.06 | Cum |
| 5 | Furnishing and Placing M-25 RCC in super-structure as per drawing and technical specification.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 99.01 | Cum |