Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4829175 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Naveen Tent Sarasaulee Varanasi Se Ramesh Mistree Ke Ghar Tak |
| Last Date For Submission | 17th Jul, 2026 |
| Opening Date | 17 Jul, 2026 |
| Document Cost | 2714.00 |
|---|---|
| EMD | 127000.00 |
| Estimated Cost | 6326000.00 |
| City | Varanasi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in cutting or in embankment in ordinary soil excavation pits not exceeding 1/2 meter (20") in depth and earth work in enbankment to be in 20cm (8") layers, including ramming and dressing the surface to required levels and slopes and also including 1.5m (5") lift and 30m (100') lead. the earth form cutting to be used in making embankent or to be deposited as spoil banks within 30m (100') distance as directed by the E/I. S.I.No-253 I/C Mechanical Compaction in layer by Road Roller | 819.42 | cum |
| 2 | Earthwork Excavation in foundation in ordinary soil excavation to earth work in enbankment to be in 20cm (8") layers, including ramming and dressing the surface to required levels and slopes and also including 1.5m (5") lift and 30m (100') lead. the earth form bydistance as directed by the E/I. S.I. No 251 | 665.69 | cum |
| 3 | Concrete with 4cm. Gauge brick ballast, sand of 1.25 F.M. and cement in proportion of 12:6:1 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work S.I. No-273 | 74.66 | cum |
| 4 | Providing and laying 350 mm Dia NP3 RCC hume pipe medium duty confirm to IS 458 : 2003 including collars / spigot jointed with stiff mixture of cement in the proportion of 1:2 including testing of joints all taxes transportation charges & contractor "s profit etc. complete. | 755.00 | rm |
| 5 | M-150 brick work in 1:4 Cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work. S.I. No-305 | 66.44 | cum |