Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4424943 |
|---|---|
| Organisation Name | Irrigation And Flood Control Department |
| Tender Brief | Corrigendum : Restoration Repair Re Construction Of Flood Protection Work At Various Spots Of Block Vijaypur And Ramgarh In River Devak In Local Nallahs As Per Necessity Of Site Requirement |
| Last Date For Submission | 4th Jun, 2026 |
| Opening Date | 05 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 20000.00 |
| Estimated Cost | 0.00 |
| City | Vijaypur |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared | 1.00 | 100 Sqm |
| 2 | Dismantling old protection work including cutting of crates and stacking of stones. | 1.00 | Cum |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 1.00 | Cum |
| 4 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 1.00 | Cum |
| 5 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil (rolling and watering not included) | 1.00 | Cum |
Ending Today