Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5026198 |
|---|---|
| Organisation Name | Municipal Administration And Water Supply Department |
| Tender Brief | Construction Of New Office Building (type 2) In Virudhachalam Municipality |
| Last Date For Submission | 7th Aug, 2026 |
| Opening Date | 07 Aug, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 388000.00 |
| Estimated Cost | 38800000.00 |
| City | Virudhachalam |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental of cers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard speci cation and as directed by the departmental of cers.- Upto 2.40m Footing Depth. | 779.00 | cum |
| 2 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental of cers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms at the site, etc., complete complying with standard speci cation and as directed by the departmental of cers. | 194.00 | cum |
| 3 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental of cers and clearing and levelling the site, etc., complete complying with standard speci cation and as direct-ed by the departmental of cers. | 60.00 | cum |
| 4 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental of cers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard speci cation and as directed by the departmental of cers. | 133.20 | cum |
| 5 | Supplying and lling in foundation, basement, etc with lling stone Dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard speci cation and as directed by the departmental of cers. | 118.00 | cum |
17 Days Left