Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4342192 |
|---|---|
| Organisation Name | Bhabha Atomic Research Centre |
| Tender Brief | Corrigendum : Construction Of Embankments For The Phase Ii Road And Patrolling Roads And Culverts And Other Miscellaneous Works In Barc Main Campus, Atchuthapuram Near Visakhapatnam, Ap |
| Last Date For Submission | 25th Jun, 2026 |
| Opening Date | 06 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 5576000.00 |
| Estimated Cost | 387796610.00 |
| City | Visakhapatnam |
|---|---|
| State | Andhra Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | The item rates quoted by the Contractor for the relevant items shall, unless otherwise specified, also include compliance, supply and carrying out the following and no separate payment would be made for the same. 1.General works such as clearance of site, Survey, setting out of road embankment alignemnt and levelling, preparation of complete plan and profile of the road and clearance of works after completion; 2.Samples of materials for test; Design of mixes; Design calculation for temporary works. 3.Test reports for all steel and cast steel as per the relevant provisions of the Specifications. 4.Testing of various finished items and materials including bitumen, cement, concrete as required under these Specifications and furnishing test reports/certificates. 5.Inspection Reports in respect of formwork, staging of work as per the relevant Specifications; 6.Testing of various BOQ items of works as specified in QAP and other relevant Clauses & Cost of in-built provisions for Quality Assurance. 7.Arrangement of temporary Electric power supply / Diesel generators , lighting arrangements in work areas for carrying out all the activities of the tendered work. 8. The plan & profile for all the roads & embankments and complete design for the bridge shall be under the scope of this work. | ||
| 2 | Clearing Jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at height of 1m above ground level and removal of rubbish up to a distance of 200m outside the periphery of the area cleared as per specifications and as directed by the Engineer-in -charge | 111000 | sqm |
| 3 | Cutting and felling of trees of girth beyond 60 cm Girth up to and including 120 cm girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material inside project campus within the boundary at places shown etc. complete as per specification and as directed by the Engineer-In-charge. | 240 | Nos |
| 4 | Cutting and felling of trees of girth beyond 120cm Girth up to and including 240 cm girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material inside project campus within the boundary at places shown etc. complete as per specification and as directed by the Engineer-In-charge. | 140 | Nos |
| 5 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in foundation of culverts or any other structure etc., in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom of foundations etc. including shoring, strutting and dewatering and refilling around foundations and plinth with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing jungle,uprooting of vegetation, grass, etc.complete all as per as per drawings, specification and as directed by the Engineer-In-charge. |
9 Days Left