Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3772151 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Construction Of Parking Shed For Specialist Vehicles At Ins Kalinga Visakhapatnam Special Work |
| Last Date For Submission | 29th Apr, 2026 |
| Opening Date | 01 May, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 296000.00 |
| Estimated Cost | 22100000.00 |
| City | Visakhapatnam |
|---|---|
| State | Andhra Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | supply , fabrication & erection of pre-fabricated steel STRUCTURE / building is made up of primary members,secondary members, connections,roof sheeting,wall sheeting, sheeting fasteners,sealer,closures,ridge cap,flashing and trim,gutters and down spouts as in Parking shed for specialist vehicles complete all as as specified and shown on drawings. | 1.00 | Lump Sum |
| 2 | SCH 'A' PART-II to VII : Note: These schedules are pre-priced by MES and the rate indicated against the respective schedule under Col 6 signifies this fact only. The tenderer is required to quote their lumpsum amount under col 13 against item of works catered under these schedule . | ||
| 3 | Lumpsum price inserted under col 13 by the tenderer for SITE CLEARANCE, EARTH WORK EXCAVATION AND DEVELOPMENT as listed in Schedule A Part II representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule A Part II | 1.00 | Lump Sum |
| 4 | Lumpsum price inserted under col 13 by the tenderer for BUILDING/STRUCTURE( UPTO PLINTH LEVEL) as listed in Schedule A Part III representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule A Part III | 1.00 | Lump Sum |
| 5 | Lumpsum price inserted under col 13 by the tenderer for Road/Path/Culvert as listed in Schedule A Part IV representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule A Part IV | 1.00 | Lump Sum |
15 Days Left