Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Hindustan Shipyard Limited
Tender ID3905504
Organisation NameHindustan Shipyard Limited
Tender BriefCorrigendum : Installation Of Atds System On Ins Project
Last Date For Submission10th Apr, 2026
Opening Date10 Apr, 2026
Cost
Document Cost0.00
EMD25000.00
Estimated Cost0.00
Location
CityVisakhapatnam
StateAndhra Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Ops Room a) Removal of Electrical Equipments (Approx 400 Kgs each 5 Nos) from location for creating Space for Installation of ATDS Sub units viz : DCP,DDR,MCP,DBs. b) Fabrication and installation of Foundations for fitment of above . c) New foundation to be Fabricated and installed for Relocating RDDU. d) Shifting of New Equipment s from Workshop to Location is under Contractors Scope.1LS
2Ops Room Lobby a) Removal of Electrical Equipments (Approx 400 Kgs each 5 Nos ) from location for creating Space for Installation of ATDS Sub units viz : CFP , ITU. b) Fabrication and installation of Foundations for fitment of above . c) New foundation to be Fabricated and installed for Relocating EOGFCS d) Shifting of New Equipment s from Workshop to Location is under Contractors Scope1LS
3Bridge a) Removal of Electrical Equipments, DBs, ,etc (Approx 300 Kgs each 3 Nos ) from location for creating Space for Installation of ATDS Sub units viz : RDU , DBs b) Fabrication and installation of Foundations for fitment of above . c) Shifting of New Equipment s from Workshop to Location is under Contractors Scope1LS
4Quarter Deck (a) Major deck modification is required in quarter deck for fitment of winch system onboard. (b) Winch to be placed after frame number 8 to frame number 15 and between the port side pillar and the centre line of the ship. (c) Winch centre line shall be 2400mm from the ship centre line towards port side. (d) 03 RU lockers are required to be relocated for installing winch sheave subsystem and Hydraulic power pack. (e) Telephone box and power supply box to be elevated in the same bulkhead to facilitate mounting of winch power panel for which all foundations are to fabricated and Installed and items to be fixed. (f) Clear space is required at the aft and for mounting of the sheave and deployment of the array. The area between 2nd and 3rd frame on aft end to be made available by removing frames and plates and increasing the area of the window. (g) Total space requirement from for Winch system is approx. 7m from the aft end for winch and sheave. (j) CVD can be placed on Quarter deck adjacent to Capstan operating panel, (k) Necessary deck strengthening is required to be done at the winch system location. Approx 3 Tons (l) Sheaves to be fitted at aft end, after relocating the RU boxes along with supply of fresh water at 1 bar pressure ( 20 LPM). (m) Hydraulic power pack to be located as per the layout options at Quarter deck. (n) Winch power panel (WPP) JB-winch and JB-PP, automatic change over switch (ACOS), switch disconnector fuse (SDF), Display unit , Winch, Towed Array, Towed Cable roller must be located at Quarter deck Note : 1. All Foundations to be Fabricated and installed by contractor only. 2. Shifting of all items and securing is under contractors Scope. 3. Deck Strengthening is under Contractors Scope. 4. All in way Jobs to be considered in the Scope.1LS
5Gun Deck a) Launcher Foundations (P & S) to be fabricated and installed in position.(Approx 3000mm Dia) b) Deck strengthening to be carried out on Both Port and Stbd Gun Deck locations (Approx 4 Tons-P&S). c) Launchers to be shifted from Workshop and to be fitted in Position. d) All Degutting of Items, Piercing of Bhds, Bhd Glands Fitment etc is under contractors Scope. e) Shifting of New Equipment s from Workshop to Location is under Contractors Scope f) Pneumatic Lines to be drawn from HP air Bottle to Launchers. ( Isolating Valve , Strainer , Pressure Reducer Valve (200- 50BAR), Pressure relief Valve, Isolating Valve, Safety Relief Valve along with SS Pipe lines to be installed in the System . BOM attached at Annexure I. )1LS
10th Apr, 2026

6 Days Left

WhatsApp