Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4261010
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Repair And Maintenance Of Fire Main Pipeline System With Associated Fittings Fire Hydrants Valves And Ss Fasteners And Other Components At Drydocks Naval Dockyard Visakhapatnam Under Ge (i) (dm) Visakhapatnam
Last Date For Submission16th Jun, 2026
Opening Date18 Jun, 2026
Cost
Document Cost1000.00
EMD182370.00
Estimated Cost10737000.00
Location
CityVisakhapatnam
StateAndhra Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Material & labour for PCC (1:2:4), type B1 (using 20 mm graded stone aggregate) as in pillar to support the pipe lines including necessary form work and finishing the exposed surfaces of concrete fair and even all as specified and directed50.00CuM
2Day to day maintenance of Fire-main system of length of 2610 RM include associated fitting & accessories for the dia of 300mm - 1100 RMtr, 200mm - 320 Rmtrs, 150mm - 520 Rmtrs, 100mm - 550 Rmtrs, 80mm - 120 Rmtrs; Groud Monitoring Valves - 04 Nos, Hydrant Valves - 57 Nos, 300mm Valves - 15 Nos, 250mm Valves - 06 Nos, 200mm Valve - 06 Nos, 150mm Valves - 16 Nos, 100mm Valves - 44 Nos, 80mm Valves - 07 Nos as follows including following: a) Ensure that there is no leak through valve glands & pipe joints in the system, and ensure all hydrants are in working condition includes presssure gauges. b) Check and make all fire-hydrant valves for smooth operation in the system c) Check and apply greasing for all hydrant & branch valves264.00Each
3d) Ensure proper supporting for enire dock down point and branch lines and main line if not plac the supports by strctural / civil works e) Replace the rubber dsic seal for hydrant valve if leak heavy. f) Inspect and operate the ground monitoring system with foaming ensure working properly with associated valves are works free to operate g) Maintenace of firemain manifold with associated valves and make sure no leakge while operates h) Inspect the complete internal Main line and related valves are working make open and close fully free operation of valves i) Clamping & Supports to be verifired and to be repaired if any found damage j) Inspect, Identy and change any dia/ length wornout pipeline as suggested and directed by Engineer In-charge k) Overhauling the firemain manifold with associated valves l) Overhauling the Hydrant valve
4Note: Firm to supply and position sufficient lighting, ventilation provision and a 100 TPH submerible pump in the pits/ galleries/ dock points etc. whereas required separetly with all associated panels, discharge pipe to discharge from pump house (minus 20 Mtrs)/ galleries/ dockfloor to sea (Jetty level) so as to ensure that residual water is nill at all points of time. Firm is not to depend on the availability of the pump house equipment and should make its own arrangements for removal of water from galleries/ dockfloor/ pump houses. Any delay in work with regards to presence of leakage of water is attributable to firm. Firm should have its own ararangement of suffiecient tools & jigs, crane and lifting assesories for lift and renewal/ repair/ overhaul of pipelines/ valves and associated parts. If required firm should provide additional capacity pump as standby as suitable to existing fire-main pump pressure.
5M & L for painting, clean, chip & paint all the pipes & valves with one coat of anti corrosion primer & two coats of Signal Red paint complete all as specified and as directed.3500.00RM
16th Jun, 2026

6 Days Left

WhatsApp