| 1 | Dismantling of existing electric/ diesel driven pump set from its installed position, including disconnection of electrical wiring, suction and delivery pipe connections, removal of foundation bolts, lifting, handling and transportation, and handing over the dismantled pump set to the MES store yard, complete all as specified and as directed by Engineer-in-Charge. | 2.00 | Each Job |
| 2 | Supply, installation, testing, and commissioning of electric-driven vertical turbine pump with bronze impeller, TEFC IE2 Solid shaft NFLP IP55 Motor 30 HP, gland packing type sealing arrangement suitable for 3-phase, 415 V, 50 Hz motor, 30 m head, 48,000 GPH discharge, total suspension length approx 11 mtr, self water lubrication type pump, including ERW heavy duty column pipes, bowl assembly, shafting, thrust bearings, suction strainer, alignment, coupling, common MS base plate, foundation bolts, nuts and washers, alignment of pump and motor, grouting, vibration control arrangement, making all mechanical and electrical connections, complete with PCC foundation as per OEM recommendation shuttering if required, curing and finishing, complete with trial run, testing to full load conditions, and commissioning, complete all as specified and as directed. | 1.00 | Each |
| 3 | Supply, installation, connecting, testing and commissioning of non clog sewage submersible pump set suitable for delivering 1560 - 180 LPM at 6 - 24 m total head, complete with CI casing, CI impeller, Carbon steel shaft with carbon silicon carbide mechanical sealing arrangement with lantern ring, and renewable wearing rings, designed for continuous operation; complete with suitably rated AC 3-phase, 415 V 10%, 50 Hz TEFC copper wound squirrel-cage induction motor, IE2 efficiency, NFLP, IP68 protection, Class F insulation, all standard fittings and accessories, and all materials, labour and incidental works required to complete the pump set in all respects in accordance with relevant IS/BS standards for sewage dewatering application including painting with PO red colour, complete all as specified and as directed. | 1.00 | Each |
| 4 | Supply, installation, testing and commissioning of Direct-On-Line (DOL) starter suitable for 415 Volts, 3 Phase, 50 Hz AC supply, for pump motor up to 10 HP capacity, to be installed in existing LT panel, complete with all necessary accessories such as contactor, thermal overload relay, single phasing preventer (if required), control wiring, power and control cables of suitable size, cable glands, lugs, earthing connections, and mounting arrangements, including all interconnections for proper operation, complete all as specified and as directed. | 1.00 | Each |
| 5 | Supply, laying in trenches or fixing on wall or passing through pipe or in cable ducts, XLPE insulated PVC screened , PVC bedded and PVC tape sheathed galvanised steel strip or wire armoured electric power cable (heavy duty) 1100 volts grade with stranded aluminium conductor of 3.5 core 50 sqmm size cable,complete all as specified and directed. | 30.00 | RM |