Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3990284 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Periodical Services To Internal And External Surfaces Of Certain Buildings Of Otm And Md Acn At Malkapuram Dhq6 Cg Eastern Seboard Campus At Icgs Visakhapatnam Under Ge (i) (cg) Vizag |
| Last Date For Submission | 4th May, 2026 |
| Opening Date | 06 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 40000.00 |
| Estimated Cost | 2000000.00 |
| City | Visakhapatnam |
|---|---|
| State | Andhra Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M & L for preparation of old decorated surfaces of walls by washing down or by steel wire brushing and applying one coat of cement base paint complete all as specified and as directed. | 500.00 | Sqm |
| 2 | M&L for preparation of old decorated surface of wall by washing, rubbing down, and removal of stains and applying one coat of weather proof exterior acrylic emulsion paint having dart pick up resistant,silicon enhanced,UV resistant and PU enhanced property over a coat of alkali resistant primer over anti fungal wall care putty including all necessary scaffolding complete all as specified and as directed. (Note: (i) Work shall be carried out upto fourth story building (ii) Quoted rated is deemed to be inclusive rate of scaffolding and no extra amount shall be paid to the contractor in this matter.) | 11300.00 | Sqm |
| 3 | M&L for applying wall care putty not exceeding 2 mm thick on walls / ceilings to obtain a smooth surface including preparation of surface and making good complete all as specified and directed. (Note: Quoted rated is deemed to be inclusive rate of scaffolding and no extra amount shall be paid to the contractor in this matter.) | 787.00 | Sqm |
| 4 | M&L for complete removal of existing treatment from old decorated surface of wall, preparation of the surface by washing, rubbing, stopping etc and applying two coats of oil bound distemper over a coat of alkali resistant primer including all necessary scaffolding complete all as specified and as directed. (Note: (i) Work shall be carried out upto fourth story building (ii) Quoted rated is deemed to be inclusive rate of scaffolding and no extra amount shall be paid to the contractor in this matter.) | 9558.00 | Sqm |
| 5 | M & L for preparation of old painted steel surfaces of any description, over 10 cm width or girth, not otherwise described and applying one coat of synthetic enamel paint complete all as specifed and as directed. | 100.00 | Sqm |
20 Days Left