| Tender ID | 4074928 |
|---|---|
| Organisation Name | Uttar Pradesh Housing And Development Board |
| Tender Brief | Interlocking Tiles Work In Road And Construction Of Drain At Sri Rajesh Singh House To Distt. Hon. Judge Sri Ramashare Singh To Sri Kamalapati Tripathi House At Shankarpurwa Ward-ii, Lucknow |
| Last Date For Submission | 8th May, 2026 |
| Opening Date | 08 May, 2026 |
| Document Cost | 5310.00 |
|---|---|
| EMD | 328000.00 |
| Estimated Cost | 16366192.00 |
| City | Vrindavan |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and laying spreading and compacting graded stone agreegatge to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layer in sub-base course on well prepared surface and compaction with vibratory roller to achieve the desired density As per direction by E/I | 1172.08 | Cum |
| 2 | Supply of 80mm thick Precast cement concerete Interlocking paver blocks with top layer of minimum 8 mm thickness having plan dimension 200x(160+120mm) of O.P. Cement smooth high gloss finish, skid resistant: manufactured from rubber moulds through vibro- compression mechanism. The compressive strength of concrete paver block shall not be less than 30Mpa (M-30) confirming to IS: 15658-2006 including cost of material, labour, T & P etc required for proper completion of the work including 50mm thick local sand bed as directed by Engineer-in- charge.As per direction by E/I | 5860.40 | Sqm |
| 3 | Providing and laying of cement concrete in 1:4:8 (1 cement 4 C.sand 8 40mm stone balast) including supply of all materials labour T&P etc.complete with form work as per direction by E/I., (For Toewall) | 47.04 | Cum |
| 4 | Class 150 Brick Work in 1:6 cement and coarse sand (FM 1.50 to 2.00) mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work & as per direction by E/I. (For Toewall) | 157.78 | Cum |
| 5 | Providing and laying of cement concrete in 1:1.5:3 (1 cement 1.5 C.sand 3 20mm stone grit) including supply of all materials labour T&P etc.complete with form work as per direction by E/I., | 23.52 | Cum |