Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4077983 |
|---|---|
| Organisation Name | Uttar Pradesh Housing And Development Board |
| Tender Brief | Restoration Work Of Internal Road, Drain And Sewer Connection Work Of Sec- 6c (k) At Vrindavan Yojna No-1 Lucknow |
| Last Date For Submission | 16th May, 2026 |
| Opening Date | 16 May, 2026 |
| Document Cost | 5310.00 |
|---|---|
| EMD | 506000.00 |
| Estimated Cost | 24818149.00 |
| City | Vrindavan |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3, MORD-302 (3.5) II | 1049.85 | Cum |
| 2 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. | 1353.00 | Sqm |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with on prepared surface, mixing by mix in place method at OMC, and compacting with vibratory roller to achieve the desired density complete in all respect and as per relevant clause of MORT & H section,-401. | 231.00 | Cum |
| 4 | Providing and laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layer in sub-base course on well prepared surface and compaction with vibratory roller to achieve the desired density (MORT&H) SPECIFICATION N0 406 | 613.20 | Cum |
| 5 | Providing and applying prime coat with 60/70bitumen emulsion on prepared surface of granuler base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.including supply of all materials, labour and T&P etc required to proper completion of the work as per Morth clause 502. | 11200.00 | Sqm |
22 Days Left