| 1 | 1. Technical Details Specific to Project:
Aquaculture Fish Farming Cage Grow Out, 16 Mtr Dia. (Circular 62.83 m) 1+5 m Deep / Bream Safe / Knotless (Normal Knot) / Black / 132 Ply / 45 mmKK / MBS 45Kgf +/-5 % / Feed screen 1 m / Fixed 0.5 Mtr Above and 0.5 Mtr Below water line / 14 mm Maxima / 3 strand / Lgreen/ Lead Ropes PES BOB Lead rope 0.2 kg/ mtr / PVC LOOPS / Hose Pipe Blue Transparent ID 19 mm / Loops atwaterline & bottomline / All Netting,Twine, Ropes UV resistant.
Bird cage cover Net -22 mtr Dia (Cric 69.12 m) HDPE/ Twisted Knotted / Black / 280D/ 63 PLY (2.5 MM) / 200MMKK/KBS 105.6 kgf/Perimeter Rope 12 MM Maxima / 3 strand / Cross/ rope 1+1 = 2 Nos/ Lgreen /All Netting,Twine ,Rope UV reistant.
HDPE pipes
16 mtr round/octagonal cage in HDPE pipes as per IS-4984 PE 100 PN4 315 OD, 4KG, HDPE Fitting silver coated film.
FLOATING HOUSE SPECIFICATION
Dimensions
Size of Floating House: 15 Feet 15 Feet 10 Feet
Structural Framework as on norm.
The complete structure shall be fabricated using heavy-duty MS Pipe Framework.
All MS pipes shall be coated with anti-rust primer and paint.
The structure shall be strong, stable, and suitable for water installation.
Floating Arrangement
The floating platform shall be mounted on high-quality HDPE / Plastic Drum Floaters.
Proper balancing and anchoring arrangements shall be provided for stability on water.
Flooring
Flooring shall be made of durable galenium Sheet with proper support structure.
Flooring shall be capable of with standing regular operational load.
Walling
Side walls shall be covered with durable Iron Sheet Cladding.
The wall sheets shall be weatherproof and corrosion-resistant.
Door & Window
One main door of size 6 Feet 3 Feet shall be provided.
Three window of size 3 Feet 2 Feet shall be provided with proper frame fitting.
Roofing
Roof structure shall be fabricated using strong framework and covered with suitable sheet material to prevent water leakage and withstand weather conditions.
Lighting Arrangement
One 20 Watt Solar Light System with battery & complete fitting ,wiring shall be installed.
Safety & Stability
The floating house shall be designed to ensure safe and stable operation on water.
Necessary fastening, anchoring, and safety provisions shall be included.
Quality Standards
All materials shall be new, unused, and of standard quality.
Other cost Transportation/ Boat cost (Motor Boat, LDM fiber boat, 22 F* 6 F, 40 HP Engine with Mercury company.
Installation + Labour Sensor camera, sensor Fencing, safety jacket Fish seed
Nos.Of 70000 fingerlings
Fish feed Specification Starter Feed
Fish Weight : 20 gm to 75 gm Feed Size : 2 mm Protein / Fat : 32 / 6 Approx. Requirement : 6000 Kg
Grower Feed Fish Weight : 75 gm 300 gm Feed Size : 3 mm Protein / Fat : 30 / 5 Estimated Requirement: 42000 Kg
Brood Stock Feed Fish Weight : 300 gm onword. Feed Size : 4 mm Protein / Fat : 28 / 4 Approx. Requirement: 58000 Kg
( 106 metric ton feed required ) Others (includes labour, transportation, security, test samples, medicines, insurance, repairs)
Medication.
Training
Non residential (Fish Feeding, fish growth monitoring, Fish Monitoring and mesure, Motors boat handling, market evaluation,marketing and Value addition) | 3.000 | Nos |