Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Irrigation Department
Tender ID4443769
Organisation NameIrrigation Department
Tender BriefGeneral-investigation Estimate - Investigation For Construction Of Check Dam Across Kabini River At Chekadi In Pulpally Panchayath, Sulthan Bathery La, Wayanad Dist.-general Civil Work
Last Date For Submission5th Jun, 2026
Opening Date09 Jun, 2026
Cost
Document Cost1100.00
EMD12457.00
Estimated Cost0.00
Location
CityWayanad
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Site Investigation
256.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations).0.350Hectare
360.11.2:Taking FLY LEVELS- from the nearest GTS BM and closing on the starting BM including conveyance of instruments etc along road or in heavily built up area or in roads with heavy traffic or in thick jungle ( out turn 4000 m / day )2000.000metre
460.11.1:FIXING TBM- Supplying and fixing TBM with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, painting top and sides of pillar with synthetic enamel paint, lettering in the pillar block with 8cm high "TBM" on one face and the reduced level on the outer face, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation.1.000each
5OD14137/2024-2025:Conducting topographic survey in river for taking cross sections at suitable intervals and preparing contour maps showing 2m interval contours using Total Station or such approved methods showing all topographic features like culverts and crossings, survey stones and other permanent objects and the preparation and submission of maps at suitable scale (plan, cross sections, longitudinal sections etc,indicating the contour lines m2 interval ni digitized forms including supplying 5 numbers of soft copies CD/DVD, 5 numbers of hard copies of print outs etc complete as per the direction of departmental officers at site (outturn 6 hect/day17.500Hectare
5th Jun, 2026

5 Days Left

WhatsApp