Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4858118 |
|---|---|
| Organisation Name | Department Of Agriculture |
| Tender Brief | Setting Up Of Agri. Development Of Training Centre With It Facilities At Lefunga Under Lefunga Agri. Sub-division, West Tripura Sh Yard Development Of Lefunga It Building Complex. |
| Last Date For Submission | 20th Jul, 2026 |
| Opening Date | 20 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 26538.00 |
| Estimated Cost | 1326891.00 |
| City | West Tripura |
|---|---|
| State | Tripura |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth Work | ||
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.-All kinds of soil | 225.00 | Cum |
| 3 | Earthwork in excavation for structures as per drawing and MoRT&H technical specifications Clause 304 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. | 5.93 | Cum |
| 4 | Construction of Subgrade and Earthen Shoulders cum Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site , spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per MoRT&H Technical Specification clauses of section 300. | 120.00 | Cum |
| 5 | Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per drawings & MoRT&H technical specifications Clauses 409. | 58.50 | Cum |
13 Days Left