Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4284284 |
|---|---|
| Organisation Name | Haryana Power Generation Corporation Limited |
| Tender Brief | Corrigendum : Repair Of Plant Peripheral Road Towards Village Dusani Boundary Wall Side At Dcrtpp, Yamuna Nagar |
| Last Date For Submission | 12th Jun, 2026 |
| Opening Date | 15 Jun, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 172291.00 |
| Estimated Cost | 7300458.00 |
| City | YAMUNA NAGAR |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | HSR Item 17.36.4-Seal Coat 4. Type B with VG - 30 bituminous binder Providing and laying of premix sand seal coat premixed in continuous type HMP of appropriate capacity not less than 75 tonnes/ hours using specified fine aggregates and penetration grade bitumen @0.68 kg/sqm laid to specified levels, grade and cross fall complete as per technical clause 511 of MORT&H specifications. | 11250.000 | Sqm |
| 2 | HSR Item 4.1-Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 12000.000 | Sqm |
| 3 | HSR Item 7.55-Brick edging 7cm wide 11.4 cm deep to plinth protection with common burnt clay non-modular bricks of class designation 7.5 including grouting with cement mortar 1:4 (1 cement : 4 fine sand). | 2000.000 | Metre |
| 4 | HSR Item 17.25.1-Prime Coat @ 0.85kg per sqm 1. Prime Coat @ 0.60kg per sqm Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications | 11250.000 | Sqm |
| 5 | HSR Item 5.7.4-Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar | 49.500 | Cum |
12 Days Left