Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4382144 |
|---|---|
| Organisation Name | Directorate Of Urban Local Bodies |
| Tender Brief | Corrigendum : Construction Of Street And Covered Drain From Peeple Tree To Hec, Saini Kiryana To City Gym, Hec To City Gym And Adjoining Street Of Saini Kiryana In Kesar Nagar Colony Ward No 03 Mcynr-jgd ( For L/c Society Ltd |
| Last Date For Submission | 11th Jun, 2026 |
| Opening Date | 12 Jun, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 113800.00 |
| Estimated Cost | 5690187.00 |
| City | Yamunanagar |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | $518.210 | cum |
| 2 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | $216.000 | Sqm |
| 3 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | $1120.000 | Kg. |
| 4 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | $5141.500 | Sqm |
| 5 | [20.62.2]Providing, lowering, laying, cutting (cut surface to be uniformly finished), jointing with rubber rings marked with IS : 5382 and testing of SPIGOT AND SOCKETTED RCC, NP2 MARKED WITH IS : 458-1988 and specials into trenches for all depths including carriage, loading, unloading, stacking, handling, re-handling etc. complete is all respects to the satisfaction to the Engineer - in -charge. 2. 250 mm i/d [Through Rate] | $1130.000 | Metre |
7 Days Left