Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4077179 |
|---|---|
| Organisation Name | Directorate Of Urban Local Bodies |
| Tender Brief | Strengthening Of Road With Mastic Asphalt And P/laying Of Np-2 Pipe From Main Ambala Road To Sehgal Trading Company And Construction Of Road From Sehgal Trading Co To Tarun Electrical In Dwarikapuri Colony In Ward No.-01, M.c Yamunanagar Recall |
| Last Date For Submission | 28th Apr, 2026 |
| Opening Date | 29 Apr, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 80000.00 |
| Estimated Cost | 4156479.00 |
| City | Yamunanagar |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | $193.140 | cum |
| 2 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | $89.460 | Sqm |
| 3 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | $282.600 | Kg. |
| 4 | [17.26.1]Tack Coat 1. Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications [Through Rate] | $648.000 | Sqm |
| 5 | [17.30.2]Dense Graded Bituminous Macadam with Batch Type HMP 2. Dense Graded Bituminous Macadam 50 mm to 75 mm thickness (Grading II) Providing and laying 50mm - 75 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications Note-If bitumen required is more than 4.5% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. [Through Rate] | $32.400 | cum |
4 Days Left