Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4859949 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Construction Of Residental Quarters For Primary Health Centre At Fulsawangi, Tq.- Mahagaon, Dist.- Yavatmal |
| Last Date For Submission | 30th Jul, 2026 |
| Opening Date | 31 Jul, 2026 |
| Document Cost | 2240.00 |
|---|---|
| EMD | 342000.00 |
| Estimated Cost | 34119349.00 |
| City | Yavatmal |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | BUILDING TYPE I Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 360.000 | SQM. |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 103.550 | CUM. |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | 60.480 | CUM. |
| 4 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means | 60.480 | CUM. |
| 5 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 520.980 | Sqm. |
23 Days Left