Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3841762 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : Supply Of Materials For Construction Of Pandhan Road From Heto To Dhangari Toward Talawa Farm Km 1/00 To 1/850 |
| Last Date For Submission | 2nd Apr, 2026 |
| Opening Date | 02 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Yavatmal |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supplying trap /granite /quartzite / gneiss stone metal of required size by bringing the boulders at the road side breaking them to required gradation including conveying the boulders and stacking the broken metal etc. complete. (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary, the date of approval will form par b. By Breaking boulder (Hand broken) II. 80 mm METAL Spec. No.Rd. 19,20,21,22 / page no. 197 to 201 | 462.00 | cum |
| 2 | Supplying trap /granite /quartzite / gneiss stone metal of required size by bringing the boulders at the road side breaking them to required gradation including conveying the boulders and stacking the broken metal etc, complete. (Prior approval of sample stack of broken metal by the Ex Engineer is necessary, the date of approval will form par b. By Breaking boulder (Hand broken) II. 40 mm METAL. Spec.No. Rd. Spec. No.Rd. 19,20,21,22 / page no. 197 to 201 | 210.00 | cum |
| 3 | Supplying murum having PI < 6 at the road side, including conveying and stacking complete. Spec. No.: Rd23/Page No. 202 (CSR IT.NO.2.29 A 2022-23) | 792.75 | cum |
| 4 | Supplying soft murum at the road side, including conveying and stacking complete.Spec. No.: Rd24/Page No. 202 (CSR IT.NO.2.29 B 2022-23) | 69.93 | cum |
| 5 | Compacting the subgrade/gravel/over size metal (200mm loose) layers for all width with Power roller having weight 8 to 10 MT. Including necessary, labour, materials and artificial watering complete. (CSR IT.NO.50.59 2022-23) | 2310.00 | sqm |
Ending Today